River Road from US 41 to I-75 in Sarasota County, Florida

District Office
L.K. Nandam, P.E.
District One Secretary

801 N. Broadway Ave.
Bartow, Florida 33830

Tel: 863-292-3368
Fax: 863-534-7265
E-Mail Us

Additional Contacts
Staff Directory

FDOT logo

Welcome

The Florida Department of Transportation (FDOT) District One is conducting a Design-Build project to widen River Road from north of US 41 to south of I-75. The project limits fall within Sarasota County. The project length is approximately 5.06 miles.

The project will widen the roadway from two lanes to six lanes between US 41 and Center Road, and from two lanes to four lanes between Center Road and I-75. Shared Use Paths, raised medians, wildlife crossings, signing and pavement markings, lighting, signalization, and Intelligent Transportation System (ITS) features will also be part of the project.

This project is currently under design.

Project At-A-Glance


District
One (Southwest Florida)

Financial Project ID
445059-1-52-01

Design Start Date
Mid 2021

Design Completion Date
Early 2022 (Anticipated)

Construction Start Date
Early 2022 (Anticipated)

Construction Completion Date
Early 2025 (Anticipated)

Cost Estimate
$47.5 million

Project Limits
River Road (SR 777) from US 41 to I-75

Contractor
The de Moya Group

Construction Engineering & Inspection
CONSOR Engineers, LLC

Public Information
Olivia Smith
Consultant Public Information Officer
Tel: (727)277-4965
Olivia.Smith@dot.state.fl.us



River Road from US 41 to I-75 in Sarasota County, Florida location map

Click here for full screen map.









For additional information on projects throughout Southwest Florida click SWFLRoads.com