FDOT Emergency Travel Alert:  For information on the current situation, please visit the following page - Alerts. FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

SR 29 Design from South of Agriculture Way to CR 846 E

District Office
L.K. Nandam, P.E.
District One Secretary

801 N. Broadway Ave.
Bartow, Florida 33830

Tel: 800-292-3368
Fax: 863-534-7265
E-Mail Us

Additional Contacts
Staff Directory

SR 29 Main

Welcome

Welcome to the website for the State Road (SR) 29 design project from south of Agriculture Way to County Road (CR) 846 E (also known as Immokalee Road). The Florida Department of Transportation (FDOT) District One is preparing design plans to widen SR 29 from two to four lanes from Oil Well Road to south of SR 82. In Collier County, State Road 29 is divided into four design segments. The segment between south of Agriculture Way and CR 846 E involves total reconstruction of the existing roadway, addition of shared use paths, modification to the existing signal at Farm Worker Way, addition of a signal at CR 846 E and drainage improvements. It will also include access improvements with the addition of a 22-foot median from south of Agriculture Way to CR 846 E.

Please see our Documents and Publications page for all project materials.

Project At-A-Glance


District
One (Southwest Florida)

Start Date
May 2019

Est. Completion Date
Summer 2026

Cost
Construction - $18.7 Million

Lengths and Limits
From south of Agriculture Way to CR 846 E, a distance of approximately 2.25 miles

Consultant
AIM Engineering & Surveying, Inc.

Project Manager
Dawn Ratican, P.E.

FDOT Project Manager
Kaylene Johnson, CPM
Tel: (863) 519-2396
kaylene.johnson@dot.state.fl.us



SR 29 location map

Click here for full screen map.









For additional information on projects throughout Southwest Florida click SWFLRoads.com