EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Construction Work
Phase: Design
Limits: from New Market Road/Westclox Road to SR 82
Length: 3 miles
City:
County:
Road:
Start of Current Phase: Mid 2019
Est. Completion of Current Phase: Early 2027
Letting: 07/01/2026
Estimated Costs
Construction Cost: $59 million
About

About the Design

History

In 2007 a Project Development and Environment (PD&E) Study was conducted to develop and evaluate alternative concepts for widening approximately 15.6 miles of SR 29 from Oil Well Road to SR 82 from two lanes to four lanes, and to consider potential corridors that could bypass downtown Immokalee.

Early in the PD&E Study process, FDOT conducted a corridor analysis in which four corridors were selected for evaluation within the project study area. The corridor analysis was followed by an alignment analysis, which evaluated 31 alignments within the selected corridors. The next step was to develop alternatives from the recommended alignments. The alternatives were subjected to more detailed analyses, and recommended alternatives were selected. At each phase of the process, a public meeting was conducted to provide an update on the project’s status and to take comments from the public and local agencies regarding the corridors, alignments or alternatives being presented.

With the Federal Highway Administration's approval of the PD&E Study of SR 29 from Oil Well Road to south of SR 82, the next step in the road widening process involves developing the conceptual plan presented at the PD&E public hearing and developing it into a formal set of construction plans that will be used to bid and build the widening of SR 29.

The design project for this 3.2-mile segment of SR 29 from New Market Road to SR 82 (417540-6-52-01) began in May 2019 and is currently underway. This project is currently funded for construction.

Project Objective

This project consists of widening an approximately 3-mile-long segment of SR 29. The final roadway will consist of two 12-foot travel lanes in each direction with 4-foot paved inside shoulders, 10-foot (5-foot paved) outside shoulders, 10-foot shared use paths on both sides and a 30-foot grass median. Intersection improvements are proposed for the intersection of SR 29 at New Market Road/Westclox Road. Roadside ditches will be used to collect and convey runoff for treatment and attenuation.

 



 

View Factsheet
Contact Information
Design Project Manager
Christopher Speese
239-225-1973
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
Project Documents
Project Images