Welcome to the web site for the State Road (SR) 29 design project. This project is divided into four segments for design and construction phases, which includes this segment (segment 4). The project limits are from SR 82 to the Hendry County Line, a distance of approximately 2 miles. FDOT is preparing design plans to expand SR 29 from a two-lane undivided roadway to a four-lane divided roadway. SR 29 serves as Collier County's primary link to the north and is designated as a rural principal arterial of the County. The project limits are identified on the project location map.
Project Update
FDOT held a public information meeting for the SR 29 design project on Thursday, October 11, 2018, from 6 p.m. to 8 p.m., at the UF/IFAS Southwest Florida Research and Education Center. Please visit the Documents & Publications page to view the display graphics that were provided at the meeting.
Project At-A-Glance
District
One
Start Date
January 2015
Est. Completion Date
June 2021
Cost
Design Phase-$3,100,000
Lengths and Limits
The limits of the proposed action on State Road (SR) 29 in Collier County are from SR 82 (MP 42.798) to the Hendry County Line (MP 44.884).
Design Consultant
Inwood Consulting Engineers
FDOT Project Manager
Fidel E. Vargas, P.E.