Welcome to the web site for the State Road (SR) 29 design project. This project is divided into four segments for design and construction phases, which includes this segment (segment 4). The project limits are from SR 82 to the Hendry County Line, a distance of approximately 2 miles. FDOT is preparing design plans to expand SR 29 from a two-lane undivided roadway to a four-lane divided roadway. SR 29 serves as Collier County's primary link to the north and is designated as a rural principal arterial of the County. The project limits are identified on the project location map.

Project At-A-Glance

District
One

Start Date
December 2018

Est. Completion Date
December 2018

Cost
Design Phase-$3,100,000

Lengths and Limits
The limits of the proposed action on State Road (SR) 29 in Collier County are from SR 82 (MP 42.798) to the Hendry County Line (MP 44.884).

Design Consultant
Inwood Consulting Engineers

FDOT Project Manager
Justin Reck