FDOT Emergency Travel Alert:  For information on the current situation, please visit the following page - Alerts. FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

SR 60 Resurfacing and Median Modifications Project

District Office
L.K. Nandam
District One Secretary

801 N. Broadway Ave.
Bartow, Florida 33830

Tel: 800-292-3368
Fax: 863-534-7265
E-Mail Us

Additional Contacts
Staff Directory

Project Location

Study Resources

Public Involvement
SWFL Roads Home

Travel Updates

Link to Florida 511 Travel Information

Welcome

The Florida Department of Transportation (FDOT), District One, will hold a public hearing about the median modifications and resurfacing project on SR 60 from Hillsborough County Line to Diesel Road.

Draft design plans are available for review March 1, 2016 through April 1, 2016 at the Mulberry Public Library at 905 NE 5th Street, Mulberry, FL 33860.  Library hours are 9 a.m. to 6 p.m. on Monday and Wednesday, 9 a.m. to 7 p.m. on Tuesday and Thursday, 9 a.m. to 5 p.m. on Friday and 10 a.m. to 3 p.m. on Saturday.

FDOT is designing a project on State Road 60 for 5.3 miles from Diesel Road to the Hillsborough
County Line. The project resurfaces the roadway and includes drainage improvements, guardrail installation and median modifications. As a safety improvement, FDOT will modify the existing full median opening at Bailey Road/Shady Hammock Drive by restricting left turn movements at Shady Hammock Drive. Construction should begin early 2017.

Design At-A-Glance

Public Hearing

Public Hearing Notes

District
One (Southwest Florida)

Est Start Date
Early 2017

Project Manager
Wayne Shelton
Tel: (863)519-2353
Wayne.Shelton@dot.state.fl.us


project location map

(Click on the map to view larger.)

Project Location Map