EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State Road (SR) 25/US 27 from north of Cloverleaf Rd. to south of
SR 66/SR 700/US 98, Highlands County
Resurface/Median Modifications

District Office
L.K. Nandam
District One Secretary

801 N. Broadway Ave.
Bartow, Florida 33830

Tel: 800-292-3368
Fax: 863-534-7265
E-Mail Us

Additional Contacts
Staff Directory

SR 27 Cloverleaf Rd

Project Resources

Public Notices
Documents & Publications
Contact Us

Travel Updates

Link to Florida 511 Travel Information

Welcome

The Florida Department of Transportation (FDOT), District One, is designing plans for the segment of SR 25/US 27 from north of Cloverleaf Road to south of SR 66/SR 700/US 98 in Highlands County. Project improvements include milling and resurfacing the roadway; the modification of median openings, including the addition of left turn lanes and conversion to directional openings at some locations; guardrail replacement; drainage improvements.

A Public Hearing is scheduled for 5 p.m., October 30, 2018 at the Bert J. Harris Jr. Agricultural Center, O.S. “Sam” Polston Auditorium, 4509 George Boulevard, Sebring, Florida to discuss these proposed improvements.

Project-at-a-Glance

Link to Project Location Map

District
One

Start Date
Fall 2020

Cost
$19.2 Million

Lengths and Limits
Approximately 5.9 miles on SR 25/US 27 between Cloverleaf Rd. and SR 66/SR 700/US 98

Project Manager
Wayne Shelton
Wayne.Shelton@dot.state.fl.us
(863) 519-2353