FDOT Emergency Travel Alert:  For information on the current situation, please visit the following page - Alerts. FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

US 27 Design from Polk/Highlands County Line to CR 630A

SWFL Roads Home / Project Home / About the Project

About the Project

Picture of 'Project Name'

About the Project

FDOT is preparing design plans for improvements to US 27 in Polk County.The proposed improvements to US 27 include expanding US 27 from the existing four-lane road to six lanes between the Polk/Highlands County Line and County Road (CR) 630A. The project also includes adding sidewalks to both sides of the road.

Need for the Project
US 27 is included on the Florida Interstate Highway System and the Strategic Intermodal System, is a regional freight corridor providing a vital link between Interstate 4 and Miami, and is designated as a hurricane and emergency evacuation route. FDOT anticipates this project will improve regional connectivity, accommodate projected population and employment growth, enhance safety and improve emergency evacuation.

Project Funding
This project is identified as a need in the 2040 Polk Transportation Planning Organization (TPO) Long Range Transportation Plan (LRTP) Cost Affordable Plan. Funding for the right-of-way acquisition phase of this project is included in fiscal year 2022 in FDOT's Adopted Five-Year Work Program (fiscal years 2021-2025). Construction is currently not funded.



For additional information on projects throughout Southwest Florida click SWFLRoads.com