Project Details
Work Type: Resurfacing
Phase: Construction
Limits: US 41 from North of Port Commons (North Port) to State College of Florida (Venice), Sarasota County
Length: 6 miles
City:
County:
Road:
Construction Cost: $9.5 million
About

The Florida Department of Transportation (FDOT) is partnering with Sarasota and Manatee Counties and the Sarasota-Manatee Metropolitan Planning Organization (MPO) to discuss improvements traveling among our neighboring communities. FDOT studied more than eight roadway improvements in the area. Public input was welcomed throughout the process through small group meetings, public meetings, and a robust public involvement effort.

The project is expected to begin construction in mid-2023. The improvements will consist of:

  • Milling and resurfacing
  • Overbuild
  • Widening
  • Guardrail
  • Drainage improvements
  • Signalization
  • Signing and pavement markings

Length of project:  6.1 miles

View Factsheet
Contact Information
Communications Team
Alice Ramos
863-797-7202
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
RoadWatch
  • US 41 from North of Port Commons from north of Port Commons to State College of Florida, Sarasota: Construction project: Project improvements include milling and resurfacing, guardrail, drainage improvements, signing and pavement markings, and signalization improvements. Expected completion is fall 2024.

    Daytime Activities:

    • Install barrier walls for upcoming lane shifts and close median openings for roadway crossover reconstruction.
    • Median openings at Myakka Drive, Riverwalk Drive, Boardwalk, Ortega Place, De Miranda Avenue, Eager Street and Hoffman Street will be closed for reconstruction work.
    • Hoffman Street crossover will be removed and remain permanently closed.
    • Motorists will be able to turn right only onto US 41 at these locations.
    • Daytime lane closures Monday through Friday from 7 a.m. to 3 p.m.

    Nighttime Activities:

    • Curb removal and turn lane reconstruction between Tuscola Boulevard and Ortiz Boulevard.
    • Nighttime lane closures Sunday through Friday from 8 p.m. to 7 a.m.

    Motorists should use caution when making U-turns and be aware of workers in the area.

  • US 41 from North of Port Commons from north of Port Commons to State College of Florida, Sarasota: Construction project: Project improvements include milling and resurfacing, guardrail, drainage improvements, signing and pavement markings, and signalization improvements. Expected completion is fall 2024.

    Daytime Activities:

    • Install barrier walls for upcoming lane shifts and close median openings for roadway crossover reconstruction.
    • Median openings at Myakka Drive, Riverwalk Drive, Boardwalk, Ortega Place, De Miranda Avenue, Eager Street and Hoffman Street will be closed for reconstruction work.
    • Hoffman Street crossover will be removed and remain permanently closed.
    • Motorists will be able to turn right only onto US 41 at these locations.
    • Daytime lane closures Monday through Friday from 7 a.m. to 3 p.m.

    Nighttime Activities:

    • Curb removal and turn lane reconstruction between Tuscola Boulevard and Ortiz Boulevard.
    • Nighttime lane closures Sunday through Friday from 8 p.m. to 7 a.m.

    Motorists should use caution when making U-turns and be aware of workers in the area.