EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Safety Study
Phase: Design
Limits: from William Street to Peace River Bridge in Downtown Punta Gorda
Length: 0.9 miles
City:
County:
Road:
Start of Current Phase: Early 2020
Estimated Costs
Construction Cost: $$6.62 million
About

Project Information

The intent of this project is to enhance safety for all users of the roadway (including motorists, pedestrians, and bicyclists) on this northbound, three-lane, one-way section of Tamiami Trail (US 41) and advance goals of walkability and strategic investment/development within Downtown Punta Gorda as set forth in the City of Punta Gorda’s Comprehensive Plan and Plan Punta Gorda – 2019 Citywide Master Plan.

The project Department of Transportation will conduct extensive public outreach throughout the duration of the study to help determine the best options to consider in order to maximize the results and value of the Resurfacing, Restoration, and Rehabilitation project. Potential elements to be considered include (but are not limited to) strategies to maintain consistent travel time, minimize lane changing, discourage aggressive driving, enhance pedestrian and bicycle facilities along with connections to existing area pathways and trails.

This study combines multiple project phases, including Planning, Project Development and Environment (PD&E), and Design to accelerate the project schedule and maximize the value of the project.

When will this be built?

After completion of the Design phase (anticipated in Fiscal Year 2024), the study will be eligible to move into the Right-of-Way phase. The Construction phase is anticipated to begin in Fiscal Year 2024. 

Public Involvement

The Florida Department of Transportation (FDOT), District One, is hosting a public meeting for the Northbound Tamiami Trail (US 41/SR 45) Complete Street Improvements (Financial Project No.: 441524-1-32-01). The project specifically includes roadway, pedestrian, and bicycle safety improvements along Northbound Tamiami Trail from William Street to Peace River Bridge in Downtown Punta Gorda, Charlotte County. The public meeting is being held to present information and gather public input on the proposed design of the improvements.

There are two ways to participate in the public meeting: attend the in-person event or register for and join the live online (virtual) event.

In-Person Event: The in-person event is scheduled for Thursday, January 26, 2023, at the Charlotte Harbor Event and Conference Center, 75 Taylor St, Punta Gorda, FL 33950. This “open house” event will take place from 5 p.m. to 7 p.m.

Live Online (Virtual) Event: The live online (virtual) event is scheduled for Tuesday, January 31, 2023, from 6 p.m. to 7 p.m. Please register to attend at bit.ly/TamiamiTrailPublicMeeting. The virtual event can also be accessed online through the project website at https://www.swflroads.com/project/441524-1. Once registered, attendees will receive a confirmation email containing information about joining the meeting online. Please note, Internet Explorer cannot be used to register or attend the live online (virtual) event. 

All meeting materials will be available online for viewing through the project website starting January 19, 2023. A copy of these materials will also be displayed at the in-person and live online (virtual) events.

The same material will be presented at both events. You may choose any combination of the provided options to review the materials and submit your comments.

View Factsheet
Contact Information
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
Project Documents
Project Videos
Project Images
Schedule