FDOT Emergency Travel Alert:  For information on the current situation, please visit the following page - Alerts. FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Combee Road (State Road 659) from US 98 to North Crystal Lake Drive

SWFL Roads Home / Project Home / Virtual Public Workshop

 



Virtual Public Workshop

 

November 12, 2020 -- December 3, 2020



The purpose of this workshop is to share the alternatives and analysis completed to date, and to provide an opportunity for you to comment. There is no live event associated with this workshop.

If you need ADA or translation services (o para preguntas en español), click here.

To see how this workshop was advertised, click here.


Let's get started.


Now that you've signed in, please review the project information under Steps 1 and 2.
Then proceed to Step 3 to provide comment (remember that to provide comments to be included in the meeting record, you must submit them by December 3, 2020).

Click here to skip straight to submitting a comment.

Project Video

Please watch the project video below for overall project information.



Having trouble with sound or audio? Click here to view a pdf copy of the script.


Workshop Materials

Click on the images below to download the workshop materials for additional information. For items that are a larger size, a ‘Printable Version’ has been listed for an easier download and is printable on 8.5 inch by 11 inch paper.

Handout
An overview of the project, what the alternatives are, and
all current study information
Comment Form
Print this form if you would prefer to write out and mail your comment to FDOT

Boards

 
Project Location Map Existing Conditions
Map of the study area Printable Version
Typical Section Typical Sections
Roadway elements for the existing roadway, Alternative 1, and Alternative 2
Crash History Crash History
All vehicle crashes along the roadway from the last five years
Evaluation Matrix Evaluation Matrix
Comparison of effects of all proposed alternatives
(includes No-Build)
Study Schedule Study Schedule
Anticipated PD&E activities schedule
Project Funding Project Funding
What phases of the study are currently funded

 

Alternative 1

Alternative 1 Map Alternative Map
The breakdown of the roadway for proposed Alternative 1
Printable Version
Intersection Options at Maine Avenue
The breakdown of the Alternative 1 intersection
Intersection Options at Skyview Drive
The breakdown of the Alternative 1 intersection

Alternative 2

Alternative Map
The breakdown of the roadway for proposed Alternative 2
Printable Version
Intersection Options at Maine Avenue
The breakdown of the Alternative 2 Intersection
Intersection Options at Skyview Drive
The breakdown of the Alternative 2 Intersection

 

 

MOU
Memorandum of Understanding for NEPA Assignment
Title VI of the Civil Rights Act of 1964

 

 

If you need a printed copy of the workshop materials, please click here for pickup locations.


How to submit comments


Written Comments

Submit a written comment on or before December 3, 2020 to be included as a part of the workshop record.

Email: Patrick.Bateman@dot.state.fl.us (sent by December 3, 2020)
Website: Email Updates page (submitted by December 3, 2020)
Mail: use this comment form and mail to the pre-printed address. (Postmarked by December 3, 2020)

You are able to provide written comment about the project at any time, but comments must be submitted by December 3, 2020 to be included in the record for this workshop.


Phone Line

Patrick Bateman, PE, Project Representative
(863) 519-2792

If you would like to speak to someone directly about a question, please leave a message with your contact information and availability and a member of the project team will return your call. Someone will return your call within 2 business days.
Remember: You can leave a question on the phone line until December 3, 2020 (if you wish to submit a comment for the workshop record after your call has been returned, you will still be able to do so).

 

 

 

 

 

 

 

If you need ADA or Translation Services:
Persons who require special accommodations under the Americans with Disabilities Act (ADA) or persons who require translation services (free of charge) should contact Cynthia Sykes, District One Title VI Coordinator by phone at (863) 519-2287 or by email at cynthia.sykes@dot.state.fl.us at least seven (7) days before the workshop through to seven (7) days after the start of the meeting (from November 5, 2020 - November 19, 2020).

FDOT solicita participación pública sin distinción de raza, color, origen nacional, edad, sexo, religión, discapacidad o estado familiar. Las personas que requieren adaptaciones especiales bajo la Ley de Estadounidenses con Discapacidades o las personas que requieren servicios de traducción (sin cargo) deben comunicarse con Cynthia Sykes, Coordinador del Título VI del Distrito Uno, al (863) 519-2287 o por correo electrónico a cynthia.sykes@dot.state.fl.us.

 

 

 

 

 

 



FDOT solicits public participation without regard to race, color, national origin, age, sex, religion, disability, or family status.

The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried-out by FDOT pursuant to 23 U.S.C. § 327 and a Memorandum of Understanding dated December 14, 2016, and executed by FHWA and FDOT.




For additional information on projects throughout Southwest Florida click SWFLRoads.com