Work Type: | Safety Study |
---|---|
Phase: | Design |
Road: |
About
The project proposes median modifications to reduce conflict points and increase safety at the intersection of US 98 at Lyle Parkway. Changes include converting the full median opening to a two-way directional median opening. The proposed safety improvement will remove crossing movements of US 98 from Lyle Parkway and require motorists to make right turns onto US 98 with U-turns at the adjacent median openings. Left turns onto Lyle Parkway will continue to be permitted.
Public Involvement
A public meeting was held on August 14, 2023 (virtual) and on August 15, 2023 (in-person). Materials presented at the public meeting are provided below.
Contact Information
Communications Team |
---|
FDOT-D1COMM
|
Design Project Manager |
Walter Breuggeman
863-519-2347
Walter.Breuggeman@dot.state.fl.us
|
For Media Inquiries Only |
fdot-d1comm@dot.state.fl.us
|