View project: SR 777 River Road from US 41 to I-75
-
S.R. 777 River Road from I-75 to U.S. 41:: Construction project: Road embankment installation continues on the northbound roadway from Aucilla Drive to U.S. 41, and Venice Avenue to I-75. As embankment is completed, drainage installations, subgrade mixing, curb placement, and roadway grading will continue. Sod installation, signal, ITS, and lighting work are ongoing. Trucks will be crossing the road at various locations using intermittent flagging operations. Pothole maintenance will continue as necessary on all current travel ways through the project. Crews will conduct drainage repairs, mainline paving operations, and permanent sign installation within the project limits. Flagging operations may be used to guide travelers through the work areas as paving corrections occur. Additionally, a new traffic pattern will be implemented on the night of June 3, which will shift northbound traffic to the future outside northbound lane from Aucilla Drive to U.S. 41. The traffic pattern north of Aucilla Drive will not change. Please use caution and follow all road work and regulatory signs when traveling through the project.