Manatee County Future Projects
Page 1 of 2
- 000000-0
- Connecting Communities Program
- 000000-1
- Moving Florida Forward
- 000007-1
- SR 70 Median Modifications Safety Improvements
- 111111-9
- Drainage Connection Permitting Town Hall
- 408185-3
- Anna Maria Bridge Replacement - SR 64 from SR 789 to Perico Bay Blvd
- 430204-2
- Cortez Bridge Project
- 431350-2
- 15th Street East & US 301 Boulevard East Design Project
- 436676-1
- SR 789 (Longboat Key) Project Development and Environment (PD&E) Study
- 438374-1
- South Tamiami Trail (US 41) from 301 Boulevard West to 21st Avenue West Safety Improvements/Median Modification Design Project – Manatee County
- 439013-1
- 8th Avenue West Pedestrian Safety Improvements
- 442630-1
- DeSoto Bridge Replacement
- 442630-2
- DeSoto Bridge Replacement - U.S. 41 from north of State Road (S.R.) 64 to Haben Blvd. Bridge #130053
- 444625-1
- Cortez Road Corridor Vision and Action Plan (Manatee County)
- 444807-3
- Business US 41 Traffic Operations Improvement Project
- 444843-1
- Bradenton-Palmetto Connector Project Development and Environment (PD&E) Study
- 444857-1
- Palmetto Trails Network | PD&E Study Manatee County, Florida
- 444904-1
- SR 45 (USB 41) 8TH AVE W Pedestrian Mid-Block Crossings
- 445032-1
- The SR 684 (Cortez Rd W) at Royal Palm Drive traffic signal/median modification project
- 446681-1
- Barrier Island PD&E Study
- 449653-1
- SR 45 (US 41) from Magellan Drive to 63rd Avenue