Polk County Future Projects
Page 1 of 2
- 111111-1
- US 17/ Experiment Station Road Safety Improvements
- 111111-9
- Drainage Connection Permitting Town Hall
- 419243-2
- US 27 from Polk/Highlands County Line to CR 630A
- 419243-5
- US 27 (SR 25) from north of County Road 630A to Presidents Drive
- 433558-2
- US 92 from County Line Road to Wabash Avenue
- 433856-2
- SR 60 from CR 630 to Grape Hammock Road
- 436656-1
- New York Avenue Pedestrian Crossing Design
- 436672-1
- US 98 (SR 35) from West Daughtery Road to North of West Socrum Loop Road
- 440273-1
- SR 544 (Lucerne Park Road)
- 440274-2
- SR 659 (Combee Road) from US 98 to North Crystal Lake Drive
- 442404-1
- SR 600 (US 17/92) Downtown Lake Alfred PD&E Study
- 442512-1
- Southwest Connect I-4 Corridor Master Plan Study
- 445438-1
- State Road 37 Roundabout at County Road 640 (Pinecrest Road)
- 445930-1
- US 92 (Memorial Boulevard) PD&E Study
- 446274-1
- SR 563 at Pear St / Parker St Median Modification
- 446404-1
- County Line Road Project Development and Environmental Study from Amberjack Boulevard to Frontage Road South
- 449503-1
- US 27 Regional Analysis
- 450899-2
- Polk County SunRail Expansion PD&E Study
- 451381-2
- Grandview Parkway PD&E Study
- 454941-1
- S.R. 544 from S.R. 600 (U.S. 92) to 8th Street NW (U.S. 17)