Project Details
Work Type: Construction Work
Phase: Design
Limits: from CR 846 E to North of New Market Road North
Length: 3.35 miles
City:
County:
Road:
Estimated Costs
Construction Cost: $56.3 million
About

About the Design

History

In 2007 a Project Development and Environment (PD&E) Study was conducted to develop and evaluate alternative concepts for widening approximately 15.6 miles of SR 29 from Oil Well Road to SR 82 from two lanes to four lanes, and to consider potential corridors that could bypass downtown Immokalee.

Early in the PD&E Study process, FDOT conducted a corridor analysis in which four corridors were selected for evaluation within the project study area. The corridor analysis was followed by an alignment analysis, which evaluated 31 alignments within the selected corridors. The next step was to develop alternatives from the recommended alignments. The alternatives were subjected to more detailed analyses, and recommended alternatives were selected. At each phase of the process, a public meeting was conducted to provide an update on the project’s status and to take comments from the public and local agencies regarding the corridors, alignments or alternatives being presented.

With the Federal Highway Administration's approval of the PD&E Study of SR 29 from Oil Well Road to south of SR 82, the next step in the road widening process involves developing the conceptual plan presented at the PD&E public hearing and developing it into a formal set of construction plans that will be used to bid and build the widening of SR 29.

The design project for this 3.35-mile segment of SR 29 from CR 846 E to north of New Market Road N (417540-5-52-01) began in May 2019 and is currently underway. This project is currently funded for construction.

Project Objective

The proposed improvement involves construction of a new alignment of SR 29 as a four-lane divided roadway, to serve as a bypass around the downtown Immokalee area. The design will have four 12-foot travel lanes with curb and gutter on both sides, a 22-foot median, and 12-foot shared use paths on both sides. A design speed of 45 mph will be utilized from CR 846 E to Gopher Ridge Road and design speeds of 50 mph and 55 mph will be utilized from Gopher Ridge Road to north of New Market Road N. The project also includes drainage improvements along the entire length of the corridor.

Proposed Typical Sections

The design from north of the CR 846 intersection to Gopher Ridge Road includes:

• Four-lane divided roadway
• 45 MPH speed limit;
• 12-ft shared use paths on both sides
• Emergency/Pedestrian actuated signal for Immokalee Fire Station on Airport Access Road;
• Maintaining airport, emergency, and park access.

The design from Gopher Ridge Rd to just north of New Market Road N includes:

• Four-lane divided roadway;
• 50-55MPH speed limits; and
• 12-ft shared use paths on both sides
• Signalized intersection at the SR 29/ SR 29 Bypass intersection

 

View Factsheet
Contact Information
Design Project Manager
Sean Pugh, P.E.
239-225-1925
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
Goes With
Events
  • 417540-5 & 417540-6 S.R. 29 Joint In-Person Public Meeting
    Date: Thursday, March 19th, 2026
    Start Time: 5:00 pm
    End Time: 7:00 pm

    Public Meeting - In-Person:
    Date: Thursday, March 19, 2026 from 5:00 pm to 7:00 pm  
    Location: Immokalee Sports Complex; 505 E Escambia Street, Immokalee, FL 34142
    Format:  Open House with Presentation*
    *A formal narrated presentation will be shared, followed by an open house meeting project information and several project boards available for review. Attendees will be able to view project exhibits, ask questions, and discuss potential design solutions with members of the project team. 

  • 417540-5 & 417540-6 S.R. 29 Joint Virtual Public Meeting
    Date: Tuesday, March 24th, 2026
    Start Time: 5:00 pm
    End Time: 6:00 pm

    Public Meeting - Virtual:
    Date: Tuesday, March 24, 2026 from 5:00 pm to 6:00 pm
    Location: GoToWebinar
    Register in Advance: https://register.gotowebinar.com/register/6483287258878211166
    Listen-Only Mode: Call +1 (631) 992-3221, code 586-863-429
    Format: Presentation with Question & Answer Session**
    **A narrated presentation will be shared at 15-minute intervals and attendees will be able to view project exhibits, ask questions, and discuss potential design solutions with members of the project team. The Q&A session will be open until 6:00 p.m.

Project Documents
Project Images
Typical section rendering of divided roadway with median, two travel lanes in each direction, shoulders, and shared use paths within 200-foot right-of-way.
Aerial map of SR 29 corridor showing project limits highlighted from New Harvest Road to Experimental Station Road.
Proposed typical section rendering showing divided roadway with median, travel lanes, shared use paths, and right-of-way width dimensions.