446535-1 S.R. 544 (Havendale Boulevard) Sidewalks
Roadwatch UpdateProject Details
| Work Type: | Sidewalk |
|---|---|
| Phase: | Construction |
| Limits: | Lake Blue Drive to 26th Street NW |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $1.2 million |
| Start of Current Phase: | Mid 2026 |
| Est. Completion of Current Phase: | Late 2026 |
About
The Florida Department of Transportation is starting a project to enhance pedestrian safety and accessibility along Havendale Boulevard in Winter Haven. As part of the project, crews will perform the following work.
· Install new 6-foot-wide sidewalks on the south side of Havendale Boulevard from Lake Blue Drive to 26th Street Northwest
· Upgrade pedestrian signal equipment
· Add High-visibility crosswalks at side streets and intersections
· Mill and resurface side street entrances
· Reconstruct some concrete driveways and curb ramps
· Improving turning radii at some side streets
Contact Information
RoadWatch
-
Expect westbound lane closures from 8:30 a.m. to 4 p.m. as crews begin constructing a gravity wall and sidewalk. Use caution and be prepared to merge.