447437-1 US 27 from SR 540 (Cypress Gardens Boulevard) to CR 546 (Kokomo Road)
Project Details
Work Type: | Resurfacing |
---|---|
Phase: | Construction |
Limits: | from SR 540 (Cypress Gardens Boulevard) to CR 546 (Kokomo Road) |
Length: | 5.4 miles |
City: | |
County: | |
Road: | |
Construction Cost: | $23.2 million |
Est. Completion of Current Phase: | Late 2024 |
About
The Florida Department of Transportation (FDOT) is improving the safety and rideability of US 27 from north of Cypress Gardens Boulevard to north of Kokomo Road in Davenport. Project improvements include:
- Resurfacing US 27 and connecting side street entrances
- Adding a new signal and improving the turn radius at Kokomo Road
- Adding high-visibility crosswalks at Crump Road/West Main Street and at Kokomo Road
- Replacing existing street light fixtures with LED light fixtures
Motorists can expect single lane closures during the day and double lane closures at night/overnight, so use caution, watch for equipment and workers close to the road, and be prepared to merge or stop.
Contact Information
Communications Team |
---|
Sandra Mancil
863-519-4116
|
For Media Inquiries Only |
fdot-d1comm@dot.state.fl.us
|
RoadWatch
-
Watch for daytime and nighttime single lane closures northbound from SR 540 to Peace Creek RV Park entrance as crews continue shoulder work and daytime lane closures southbound from Crump Road to SR 542 (Dundee Road). Use caution and be prepared to merge.