448974-1 S.R. 15 (U.S. 98 / US HWY 441) from NW 3rd Street to NE 120th Street
Roadwatch UpdateProject Details
| Work Type: | Resurfacing |
|---|---|
| Phase: | Construction |
| Limits: | U.S. 98 (S.R. 15) from NW 3rd Street to NE 120th Street |
| Length: | 7.8 miles |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $8 million |
| Start of Current Phase: | Mid 2025 |
About
The U.S. 98 (State Road 15/US 441) project in Okeechobee County includes resurfacing approximately 7.786 miles of roadway from NW 3rd Street to NE 120th Street to improve ride quality and safety. The work involves milling and resurfacing the pavement, upgrading pavement markings and lane markers, and replacing ADA curb ramps to meet accessibility standards. Additionally, new traffic detection loops will be installed at NW 23rd Lane and the North High School entrance to enhance traffic signal responsiveness.
Public Involvement
Aika Ranieri
Community Outreach Specialist
Heartland Operations Center
Florida Department of Transportation, District One
(O) 863.471.4881 | (C) 863.464.0743
Email: ai.ranieri@dot.state.fl.us
FAQs
Projects that are combined with this:
- 448974-1 S.R. 15 (U.S. 98) FROM NW 3RD ST TO NE 120TH ST - Pavement Only Resurface (Flex) (Project Length - 7.786 miles)
- 448975-1 S.R. 78 FROM BRIDGE #910094 TO U.S. 98 - Pavement Only Resurface (Flex) (Project Length - 1.691 miles)
- 448976-1 S.R. 15 (U.S. 98) FROM SW 23RD ST TO SW 3RD ST - Pavement Only Mill/Resurface (Flex) from 23rd St to SW 3rd St (Project Length - 1.337 miles)
- 449656-1 U.S. 441 AT 28TH ST - Safety Project - milling and resurfacing, curb and gutter, sidewalks, lighting, signing and pavement markings, and traffic loop assemblies (Project Length - 0.004 miles)
- 448973-1 S.R. 15 (U.S. 98) FROM SE 30TH TERR TO MARTIN COUNTY LINE - Resurfacing - milling & resurfacing, shoulder treatment, and pavement markings (Project Length - 9.798 miles) Grouped with - G/W 448974-1 GW 448975-1 GW 448976-1 G/W 449656-1
Contact Information
| Communications Team |
|---|
|
Aika Ranieri
(863) 464-0743
ai.ranieri@dot.state.fl.us
|
| Communications Team |
|
Nancy Morgan
941-720-6335
Nancy.morgan@dot.state.fl.us
|
| For Media Inquiries Only |
|
fdot-d1comm@dot.state.fl.us
|
RoadWatch
-
S.R. 15/U.S. 441 from NW 36th St to NE 120th St: Construction project: Crews are performing milling and resurfacing operations along S.R. 15/U.S. 441 from the Martin County Line to SE 30th Terrace. Work will occur during both daytime and nighttime hours.
- Nighttime lane closures will take place from 9 p.m. to 6 a.m. as crews complete pavement marking activities. Additional pavement marking operations may occur throughout the corridor, and intermittent lane closures should be expected during work hours
- Motorists should be aware of changing traffic patterns, heavy equipment, and workers present in the construction zone.
- Drivers are urged to use caution, obey posted signage and flagging operations, and allow extra travel time.
The estimated remaining duration of activities is four weeks.