Project Details
Work Type: Intersection Construction
Phase: Construction
Limits: Intersection
City:
County:
Road:
Construction Cost: $8.6 million
Start of Current Phase: Early 2021
Est. Completion of Current Phase: Late 2022
About

Project Description

The Florida Department of Transportation (FDOT) is reconstructing the signalized intersection on US 41 at Gulfstream Avenue and replacing it with a multi-lane roundabout. The primary goal of the US 41 improvements is to improve multi-modal mobility along the US 41 corridor, provide a safe, convenient and attractive crossing for pedestrians and bicyclists, and improve connectivity and circulation between the City of Sarasota’s Downtown Central Business District and the Bayfront area. Construction is anticipated to begin February 2021.

Improvements consist of replacing the signalized intersection on US 41 at Gulfstream Avenue with a multi-lane roundabout that will enhance connectivity, circulation, and safety. Other improvements include installation of a HAWK pedestrian crossing signal system and raised pedestrian refuge islands, adding new sidewalks and pedestrian walkways, City of Sarasota utility, underground drainage structures and fiber optic replacements, new LED streetlights and reconfiguration of the stormwater retention ponds. Expected completion is fall 2022.

Benefits of Roundabouts

  • Roundabouts have safe crossings for pedestrians and bicyclists. Slower speeds are generally safer for pedestrians.
  • Roundabouts have fewer and less severe crashes and fewer injuries. Roundabouts keep people moving, but at speeds where injury risk is greatly reduced.
  • More than 90% reduction in fatalities, 76% reduction in injuries and 36% reduction in all crashes.
  • Roundabouts offer non-stop travel with no waiting at stop signs or traffic signals.
  • Roundabouts accommodate more traffic than typical intersections.
  • Roundabouts offer non-stop travel with no waiting at stop signs or traffic signals.
  • Roundabouts eliminate the cost of traffic signals and signal maintenance. During power outages, traffic still flows freely.
  • Businesses near roundabouts have seen an increase in sales with more customers who can easily and safely drive, walk, or bike there. They can also mark a business district or main street.

Project Improvements

  • Replace signalized intersection on US 41 at Gulfstream Avenue with a multi-lane roundabout
  • Install HAWK pedestrian crossing signal system and raised pedestrian refuge islands
  • Replace underground drainage structures, utilities, fiber optic, new LED streetlights and reconfigure stormwater retention ponds
  • Construct new sidewalks and pedestrian walkways

HAWK Beacon / Pedestrian Crossing
The HAWK pedestrian beacon is a high-intensity activated crosswalk beacon originally designed as a cost-effective option for crossings at mid-block and un-signalized intersections. Unlike conventional pedestrian signals, the HAWK is only operational when activated by a pedestrian. Relatively new, HAWK systems are being used with greater frequency for the additional safety they provide for pedestrians and for the versatility of use.

Below are a few highlights of the HAWK signal system that will be featured as part of the US 41 improvements.

  • A HAWK beacon is a High-Intensity Activated crossWalk beacon
  • Primarily used for mid-block and un-signalized intersections
  • Versatile application and use
  • Cost-effective option for protected pedestrian crossing
  • Signal has 3 lights in a triangular configuration: dual red lights above a single yellow light
  • Signal stays at rest (in-active) until a pedestrian activates the signal by pressing a push-button
  • Traffic flow is uninterrupted until signal is activated by pedestrian
  • When the signal is activated, drivers are cautioned with a yellow flashing signal to prepare drivers to stop
  • Drivers stop at the sustained red light
  • Pedestrians cross during the alternating dual red flashing lights
  • The signal goes dark when pedestrian movement is complete; drivers may continue forward
  • HAWK works in conjunction with conventional pedestrian signal heads at each end of the crosswalk that indicate “Walk” and “Don’t Walk”

DOCUMENTS AND PUBLICATIONS

Project Newsletters

Temporary Pedestrian Route - A temporary route for pedestrians to use while in the construction phase.

Property Owner Notification - Project details and contact information.

FDOT welcomes and appreciates everyone's participation in the project. Meetings are developed in compliance with the Title VI of the Civil Rights act of 1964 and related statues. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status.

Information On Roundabouts

Benefits of a Roundabout - Factsheet on what a roundabout is and how it can help.

Roundabouts and First Responders - Brochure on how roundabouts can best help first responders.

Roundabouts and Pedestrians - Brochure on how pedestrians can approach a roundabout and stay safe.

Roundabout Safety [English] - English version of roundabout safety sheet.

Roundabout Safety [Spanish] - Spanish version of roundabout safety sheet.

Roundabouts entail many benefits when compared to traditional intersections. With the instillation of not only current projects, but future ones as well, it is crucial to present not only the many positives of these roundabouts but to provide sound and accurate safety protocol for these newer instillations. 

New Traffic Route Information

Temporary Traffic Movements - New traffic routes for phase 1A of construction.

Traffic Movement Video - Video depicting how traffic will move during this phase of the process.

While instillation is underway, we ask the public to follow new routes established during the construction phase of the project. The new routes will run along the outskirts of the construction zone, which will occupy where the intersection was initially, which allows for the traversal of all routes beforehand.

Resource And Information Panels

Pedestrian Signals - Video showing how the new  road signals will work and what to do when you see them.

All About Roundabouts - Informational video on roundabouts. 

How To Navigate A Roundabout - Video showing how to enter, travel, and exit a roundabout.

Florida Roundabouts - Resource website on information about Florida's roundabouts.

Roundabouts are a newer concept for many people. This requires not only a well tailored approach to presenting these ideas to the public, but also allowing this information to be easily accessible to anyone at anytime. These videos and websites allow for the public to be aware and involved in the coming instillations of new roundabouts now, and ones in the future.

Public Involvement

WEEKLY UPDATE SCHEDULE

RoadWatch Update for the Week of Sunday August 7, 2022

Sarasota
US 41 at Gulfstream Avenue Roundabout Project, Sarasota: Construction project: Crews will work within the right-of-way, medians, driveways and throughout the project limits. Please use caution and watch for construction vehicles, dump trucks, semi-trucks and heavy equipment entering or exiting the work zone.

Activities Include:

  • Installation of storm drainage pipe and structures on US 41 between 1st Street and 2nd Street.
  • Final grading of base material in the roundabout area.
  • Installation of curb and sidewalk in the roundabout area. 
  • Removal of existing curb and sidewalk on the east side of US 41 between Gulfstream Avenue and Fruitville Road.• Final grading of base material on US 41 between Main Street and Gulfstream Avenue.
  • Installation of the Ritz Carlton Drive concrete driveway.
  • Removal of existing out of service waterline pipe on US 41 between 1st Street and 2nd Street.

 

Detours/Crossings:

  • Phase 1B configuration in place (island traffic only on US 41 south of Fruitville Road and north of Main Street). Watch for new traffic patterns, traffic signals, and pavement markings. Motorists are urged to use alternate detour route, if possible.
  • Palm Avenue, 1st Street, and 2nd Street are closed at the US 41 connection in both directions. Entering and exiting the downtown area via Cocoanut Avenue to Fruitville Road is recommended.
  • Sidewalk at the northwest corner of US 41 at Gulfstream Avenue is closed. Pedestrian paths are available via US 41 Multi-Use Recreational Trail (MURT) along Ritz Carlton Drive.
  • Sidewalk on the east side of US 41 between Gulfstream Avenue and Fruitville Road is closed for reconstruction work. Pedestrians should use Cocoanut Avenue for access to downtown and to the Main Street.
  • The east pedestrian crosswalk at Sunset Drive and Gulfstream Avenue is closed. The west pedestrian crosswalk is available to cross Gulfstream Avenue. Signage and pedestrian barricades are in place for guidance.
  • Marina Jacks north parking lot entrance/exit on Gulfstream Avenue will be closed to vehicular traffic. Motorists may access the parking lot via Bayfront Drive at Main Street/Marina Plaza. No through traffic allowed through this area. Motorist may not exit the Marina Jacks parking lot via Bayfront Drive at Main Street/Marina Plaza. The south exit at Ringling Boulevard must be used to exit Marina Jacks.
  • Eastbound through travel lane on Gulfstream Avenue (towards downtown) will remain closed. Use alternate routes via Ringling Boulevard or Fruitville Road.

Detours and lane closures will be in place during various phases of the project. During construction, the speed limit will be reduced to 25 mph on US 41 and Gulfstream Avenue.

We encourage motorists to allow extra time to travel, follow the roadway signage and messaging and avoid making unauthorized U-turns or changing lanes across solid lines between the lanes when traveling through the construction work zone.

Construction activities will take place weekdays and weekends, daytime and occasionally during nighttime hours. Expect noise from grinding asphalt, hammer drills, noise and vibration from construction equipment, backup alarms, vacuum trucks, pumps, and lighting.

Improvements being made as part of this project consist of replacing the existing signalized intersection on US 41 at Gulfstream Avenue with a roundabout, installation of HAWK pedestrian crossing signal system, raised pedestrian refuge islands, replacement of underground drainage structures, utilities, fiber optic, new LED streetlights, reconfiguration of stormwater retention ponds, sidewalks, and pedestrian walkways. Expected completion is fall 2022.

FAQs

Question: What is the difference between a roundabout and a traffic circle?
Answer: Traffic circles are much larger than a roundabout and often have stop signs or signals within the circular intersection. Roundabouts are smaller and vehicles must yield before entering. Roundabouts typically operate at relatively low speeds (<25 MPH) while traffic circles allow higher speeds (> 25 MPH). Roundabouts restrict pedestrians from entering the central island while some traffic circles allow pedestrians to cross to and from the central island.

Question: How do I drive in a multi-lane roundabout?
Answer: Reduce your speed to 10-15 mph as you approach the roundabout; follow signs and pavement markings to determine the lane(s) that will serve your destination; look left for oncoming traffic (traffic moves counter-clockwise); yield to vehicles already in the roundabout and wait for a gap to enter. Once you have entered, do not stop in the roundabout; do not pass other vehicles; use your turn signal to exit the roundabout to the right; yield to pedestrians crossing the exit lane and allow emergency vehicles to pass.
 

Question: How should drivers yield to emergency vehicles?
Answer: If you have not entered the roundabout, pull over to the right and allow the emergency vehicle to pass. If you have already entered the roundabout, continue to the closest exit, and pull over once you are beyond the splitter island to allow the emergency vehicle to pass. Never stop in a roundabout.
 

Question: Should I stop inside the roundabout to let someone in?
Answer:You should not stop after crossing the yield line and are in the roundabout circle. However, you may slow down so a safe gap becomes more obvious to the driver wanting to enter the roundabout.
 

Question: How are pedestrians accommodated in a roundabout?
Answer: Pedestrians use marked crosswalks between the splitter islands that separate the roundabout approach and exit lanes. The splitter island serves as a pedestrian refuge between the crosswalks and allows pedestrians to focus on crossing one direction of traffic at a time.
 

Question: What is a HAWK signal?
Answer: The HAWK pedestrian crossing/beacon system is a high-intensity activated crosswalk beacon originally designed as a cost-effective option for protected pedestrian crossings at mid-block and un-signalized intersections. Unlike conventional pedestrian signals, the HAWK is only operational when activated by a pedestrian. The HAWK systems are being used with greater frequency for the additional safety they provide for pedestrians and for the versatility of use. We invite you to watch this informative video to learn more about the HAWK pedestrian signal system. Watch the HAWK Pedestrian Signal System Video: here
 

Question: What about visually impaired pedestrians?
Answer: Roundabouts are generally considered an advantage to the visually impaired because they can only cross one direction of traffic at a time and they can more easily distinguish between the vehicle noises. Also, the slower vehicle speeds at roundabouts make them generally safer for all pedestrians.
 

Question: How are bicyclists accommodated in a roundabout?
Answer: Bicyclists may share the roadway with vehicles or dismount and use the sidewalk and crosswalk system to navigate through the roundabout.
 

Question: How will large trucks be accommodated?
Answer: Roundabouts are designed to accommodate the turning movements of a tractor trailer rig. To accommodate the sweep of the trailer wheels as it makes its way through the roundabout, a truck apron is constructed around the inside of the circulating roadway. The apron is made of a different material or is colored differently to distinguish it from the circulating roadway and make it clear the truck apron is not intended to be driven on by smaller vehicles.
 

Question:Will I be able to access the businesses along US 41 at Gulfstream Avenue within the project limits during construction?
Answer: Yes, access to businesses will be maintained during construction. There are times that access may be limited to a single lane with flagging operations in place. The contractor will try to minimize these occurrences as much as possible and try to schedule operations at night/overnight.
 

Question:Will there be any lane closures during construction?
Answer: Yes, temporary lane closures may be in place at night/overnight between 7 p.m. and 6 a.m., and weekends at night/overnight between 9 p.m. and 6 a.m. The public will be notified in advance of lane closures through the media, the weekly RoadWatch Updates, or via Email Updates.
 

Question: Will construction take place at night?
Answer: Yes, the contractor is permitted to work during the daytime and occasionally during nighttime hours.
 

Question: Will there be any detours during construction?
Answer: Yes, there will be traffic detours in place only for night work. Road closure information will be communicated to the public at the appropriate construction phase.
 

Question: Will I be able to drive through the project limits during construction?
Answer: Yes, there will be both daytime and nighttime construction activities, but motorists will be able to navigate through the project limits.
 

Question: What will be the speed limit during construction?
Answer:During construction, the speed limit will be reduced to 25 mph on US 41 and Gulfstream Avenue. Speed limits may be adjusted throughout the project limits during construction. Once construction is complete, the speed limit will be 35 mph on US 41 and 25 mph within the roundabout.
 

Question: How long will construction last?
Answer: The estimated completion date is fall 2022, weather permitting.
 

Question: Who do I call if I have a question or concern about the project?
Answer: Contact our Community Outreach Team

View Factsheet