440339-1 US 17 from Havendale Boulevard to Brigham Road
This project has been completed and is only available for historical reference.
Project Details
| Work Type: | Safety Project |
|---|---|
| Phase: | Completed |
| Limits: | Havendale Boulevard to Brigham Road |
| Length: | 1.474 miles |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $2.76 million |
About
Safety improvements along US 17 from Havendale Boulevard / MLK Boulevard to Brigham Road in Winter Haven began in July 2022. Project Improvements include:
- Add 6-foot sidewalks along both sides of US 17
- Install new Pedestrian Hybrid Beacons (PHB) also known as High-Intensity Activated CrossWalk Signals (HAWK) with a raised pedestrian refuge in the median at New Beginnings High School
- Remove paved shoulder on the west side of US 17 from Avenue V NW to Avenue W
- Install new curb and gutter and repair existing curb and gutter along both sides of US 17
- Modify entrances at several existing driveways to bring them to current standards
- Upgrade transit stops
- Install lighting and upgrade signal equipment
- Improve drainage
View Factsheet