Project Details
Work Type: Safety Project
Phase: Construction
Limits: Havendale Boulevard to Brigham Road
Length: 1.474 miles
City:
County:
Road:
Construction Cost: $2.76 million
Start of Current Phase: Mid 2022
Est. Completion of Current Phase: Early 2023
About

 Safety improvements along US 17 from Havendale Boulevard / MLK Boulevard to Brigham Road in Winter Haven began in July 2022. Project Improvements include:

  • Add 6-foot sidewalks along both sides of US 17
  • Install new Pedestrian Hybrid Beacons (PHB) also known as High-Intensity Activated CrossWalk Signals (HAWK) with a raised pedestrian refuge in the median at New Beginnings High School
  • Remove paved shoulder on the west side of US 17 from Avenue V NW to Avenue W
  • Install new curb and gutter and repair existing curb and gutter along both sides of US 17
  • Modify entrances at several existing driveways to bring them to current standards
  • Upgrade transit stops
  • Install lighting and upgrade signal equipment
  • Improve drainage
View Factsheet
Contact Information
Communications Team
Sandra Mancil
863-519-4116
For Media Inquiries Only
fdot-d1comm@dot.state.fl.us
RoadWatch
  • Watch for possible lane closures as crews lay sod throughout the project. Use caution and be prepared to merge.

    The contractor is waiting on delivery of materials to complete the new pedestrian hybrid beacon at the New Beginnings High School. Delivery is tentatively scheduled for August 2023 with the new beacon completed by fall of 2023.