442097-1 I-75 (SR 93) from Sarasota County Line to I-275
Roadwatch UpdateProject Details
About
This project is for the construction of Arterial Dynamic Message Signs (ADMS) on I-75 at two interchanges in Manatee County. The items of work include the construction of ADMS, fiber optic cable, conduit, pull & splice boxes, verification closed circuit television (VCCTVs) cameras, power subsystem infrastructure, and device integration.
The project consists of ADMS to be installed at two (2) interchanges at I-75 on the following corridors in Manatee County:
- I-75 (SR 93) at SR 64
- I-75 (SR 93) at SR 70 (53rd Ave. E)
Public Involvement
CONTACT
Nancy Morgan
Community Outreach
Florida Department of Transportation
Sarasota | Manatee Operations Center
Cell or Text: 941-720-6335
Contact Information
RoadWatch
-
I-75 (SR 93) at the Intersection of S.R. 64 and S.R. 70: Construction project: This project is for the construction of Arterial Dynamic Message Signs (ADMS) on I-75 at two interchanges in Manatee County. The items of work include the construction of ADMS, fiber optic cable, conduit, pull and splice boxes, verification closed circuit television (VCCTVs) cameras, power subsystem infrastructure, and device integration.
Motorists can expect temporary right lane closures while crews perform drill shaft operations from 8 p.m. to 7 a.m. at the following locations:
- Tuesday, May 26, on eastbound S.R. 64 just west of I-75.
- Wednesday, May 27, on eastbound S.R. 70 just west of I-75.
- Thursday, May 28, on westbound S.R. 64 just east of I-75.
- Monday, June 1, on westbound S.R. 70 just east of I-75.
Please use caution and watch for workers in or near the travel lanes. Expected completion is late-2026.