452356-1 I-75 (SR 93) at Toledo Blade Boulevard and Sumter Boulevard Interchanges
Project Details
| Work Type: | Interchange Construction |
|---|---|
| Phase: | Construction |
| Limits: | I-75 (S.R. 93) at Toledo Blade Boulevard (Exit 179) and I-75 at Sumter Boulevard (Exit 182) |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $13.4 Million |
| Start of Current Phase: | Late 2025 |
| Est. Completion of Current Phase: | Mid 2026 |
About
FDOT is making improvements to the I-75 at Toledo Blade Boulevard and I-75 at Sumter Boulevard interchanges in Sarasota County, Florida.
452356-1: Sumter Boulevard
The I-75 interchange at Sumter Boulevard project includes the installation of signals at both ramp connections. The improvements include signals, controlled pedestrian cross walks, intersection lighting and adding a northbound I-75 free flow on-ramp from southbound Sumter Boulevard. The improvements also provide dual left turn lanes from northbound Sumter Boulevard onto northbound I-75. Sumter Boulevard is an arterial under the jurisdiction of the City of North Port.
452357-1: Toledo Blade Boulevard
The I-75 interchange at Toledo Blade Boulevard project includes the installation of signals at both ramp connections. The improvements include signals, controlled pedestrian cross walks, intersection lighting and adding a northbound I-75 free flow on-ramp from southbound Toledo Blade Boulevard. The improvements also provide dual left turn lanes from northbound Toledo Blade Boulevard onto northbound I-75. The completed project includes widening of the northbound lanes to provide 2 full lanes through the Toledo Blade Boulevard interchange. Toledo Blade Boulevard is an arterial under the jurisdiction of the City of North Port.
Public Involvement
FDOT will be hosting a Pre-Construction Information Session for the public to learn about the improvements and construction schedule. The meeting will take place:
Tuesday, January 6, 2026
4 - 6 p.m.
Suncoast Technical College, North Port Branch
4445 Career Lane
North Port, FL 34289
IF YOU WOULD LIKE TO RECEIVE CONSTRUCTION UPDATES
Contact Information
| Communications Team |
|---|
|
Michaela Zawodny
Michaela.Zawodny@dot.state.fl.us
|
| Construction Project Manager |
|
Jesten Abraham
(863) 519-2889
Jesten.Abraham@dot.state.fl.us
|
| For Media Inquiries Only |
|
fdot-d1comm@dot.state.fl.us
|