FDOT Emergency Travel Alert: For information on the current situation, please visit the following
page - Alerts.
- 436079-1
- SR 78 Bridge no. 050058 over Fisheating Creek and Bridge no. 050058 over Herbert Hoover
- 437088-1
- SR 78 Sidewalks at Various Locations
- 439430-1
- SR 78 from US 27 to Herbert Hoover Bridge
- 441942-1
- SR 31 from SR 80 (Palm Beach Boulevard) to SR 78 (Bayshore Road) PD&E Study
- 441977-1
- S.R. 25 (U.S. 27) AT S.R. 78 Intersection Reconstruction
- 442083-1
- SR 78 (Pine Island Road) Corridor Vision Plan
- 442519-1
- I-75 Southwest Connect South Corridor Managed Lanes Study
- 446291-1
- SR 78 (Pine Island Rd) from west of Chiquita Boulevard to west of Santa Barbara Boulevard
- 447875-1
- SR 78 from Evalena Lane to New Post Road
- 448864-1
- I-75 Southwest Connect Central Corridor Managed Lanes Study
- 448926-1
- SR 78 from N of Herbert Hoover Dike to CR 721
- 448970-1
- SR 78 (Pine Island Road) at Hibiscus Drive
- 448975-1
- S.R. 78 from Bridge no. 910094 over Lemkin Creek to State Road 15/ US Hwy 441(US 98)