All Completed Projects
Page 3 of 12
- 436079-1
- SR 78 Bridge no. 050058 over Fisheating Creek and Bridge no. 050058 over Herbert Hoover
- 436502-1
- US 98 at Arbuckle Creek Road
- 436563-1
- North Jones Loop Road (CR 768) Feasibility Study
- 436580-1
- State Road 70 from Orange Avenue to Turner Avenue Resurfacing and Median Modification Project
- 436926-1
- Pine Island Road (CR 78) Shared Use Path Feasibility Study
- 436928-1
- Burnt Store Road Project Development and Environment (PD&E)
- 436955-2
- SR 884 (Colonial Boulevard) at Fowler Street
- 437088-1
- SR 78 Sidewalks at Various Locations
- 437098-1
- US 27 Sidewalks in Clewiston Various Locations
- 437966-1
- SR 789 at New Pass Bridge Improvement Project
- 438027-1
- SR 563 (Harden Boulevard) from Beaker Road to Forest Park Street
- 438057-1
- SE 28 St from US 441 to SE 18th Terr
- 438059-1
- US 41 from East of SR 84/Davis Boulevard to Courthouse Shadows
- 438068-1
- Clewiston Sidewalks Royal Palm Ave. and Ponce de Leon Ave.
- 438086-1
- 13th Avenue West at US 301/US41
- 438137-1
- US 41 at Gulfstream Avenue Roundabout
- 438137-2
- LANDSCAPING - US 41 and Gulfstream Roundabout
- 438528-2
- I-275 at Skyway Wave Attenuation w/ Design Build-Miscellaneous Construction
- 438902-1
- US 98/441 (SR 15/700) at SE 18th Terrace Roundabout
- 439032-1
- SR 15/US 441/Parrott Avenue from SW 23rd Street to SW 14th Street, and SW 3rd Street to SW 5th Street