All Construction Projects
Page 2 of 4
- 445044-1
- CORTEZ RD (SR 684) FROM 86TH ST W TO W OF 30TH ST W
- 445059-1
- SR 777 River Road from US 41 to I-75
- 445296-1
- I-75 at Pine Ridge Road (exit 107) Interchange Improvements
- 445460-1
- Caxambas Court over Roberts Bay Bridge Replacement (Bridge No.: 034112)
- 445468-1
- US 98 from south of Griffin Road to Sharon Drive
- 445926-2
- SR 789 from East of Sunset Drive to Bird Key Drive
- 446207-1
- S.R. 25 (U.S. 27) from Shoreline Drive to Davis & Gaines Road
- 446266-1
- SR 80 from Veronica Shoemaker Boulevard to Kingston Drive
- 446269-1
- SR 82 from Ford Street to Veronica Shoemaker Boulevard
- 446290-1
- US 41 (SR 45) from Lychee Rd to Bay St - Resurfacing
- 446296-2
- I-75 at Daniels Parkway Interchange Improvements
- 446347-1
- I-4/SR 400 Resurfacing
- 446535-1
- S.R. 544 (Havendale Boulevard) Sidewalks
- 447287-1
- US 27 from Industrial Canal to W Sagamore Avenue Design Project
- 447379-1
- SR 55 (US 19) and SR 684; from 23rd Avenue W. to 39th Street E., from Terra Ceia Road to I-275 and at Royal Palm Drive
- 447428-1
- U.S. 17 from north of Transport Road in Bartow to Avenue G SW in Winter Haven
- 447882-1
- SR 776 From Charlotte County Line to Tangerine Woods Blvd.
- 448390-1
- US 41 (SR 45) from 63rd Avenue to 53rd Avenue
- 448930-1
- SR 29 and SR 90 (US 41) Resurfacing and Road Improvements
- 448938-1
- S.R. 25 (U.S. 27) from Stitt Ranch to Flaghole Road